Dam Nai 2 Wind Farm Project
TAGI Logistics Successfully Executes Wind Turbine Transport for Dam Nai 2 Project in Binh Thuan
On September 16, 2018, TAGI Logistics successfully completed the transportation and unloading scope for the Dam Nai 2 Wind Power Project in Binh Thuan, Vietnam, involving the safe and timely delivery of 12 complete sets of wind turbines for Siemens Gamesa. This project underscores TAGI’s growing presence in Vietnam’s renewable energy logistics sector, particularly in heavylift and OOG (Out-of-Gauge) project cargo management.
TAGI Logistics was responsible for the end-to-end transport and unloading of critical wind turbine components, including blades, tower sections, nacelles, and hubs. Each component was oversized and heavy, requiring specialized transport equipment, experienced handling, and detailed route surveys. The operation demanded precise planning and execution under tight schedules and challenging terrain.
A Leading Wind Project in Vietnam
The Binh Thuan region, known for its strong wind potential, also presents logistical hurdles such as narrow rural roads, limited port infrastructure, and unpredictable weather. TAGI’s project team conducted thorough site assessments and engineering studies to ensure a safe and efficient delivery route from port to site. Advanced equipment such as multi-axle hydraulic trailers, high-capacity prime movers, and custom lifting solutions were mobilized to support the entire operation.
Transportation
Heavylift
Throughout the project, TAGI Logistics maintained strict compliance with international safety standards and collaborated closely with Siemens Gamesa and local authorities to ensure smooth coordination and permit approvals. The company’s project management, on-site supervision, and technical logistics expertise enabled the successful and incident-free completion of the transport scope within the required timeline.
Equipment List
Hydraulic Trailer + Man Mover
Lowbed and Extendable Trailer
Crane up to 200T
Barge up to 2000DWT
Others Support System
A Remarkable Project
The Dam Nai 2 project not only highlights TAGI’s capabilities in the renewable energy sector but also reinforces its role as a trusted logistics partner for complex infrastructure projects across Vietnam. With this achievement, TAGI Logistics continues to demonstrate its commitment to delivering safe, efficient, and scalable logistics solutions for the growing onshore wind market and beyond.